Septic tank installation has to be done correctly the first time to minimize complications in the future. Because of the delicate balances between living organisms that will populate the tank, the amount of waste which might be in the tank, and the proximity to drinking water of the tank, septic tanks must always be hooked up as well as maintained properly. With all this care that should be put into fitting the tank, it can get very expensive in labor costs; trenches needs to be dug, machinery leased, not to mention the tank itself should be purchased. The right installation, however, can save thousands in repair and maintenance costs in the future of plastic septic tank installation.

You will find several different popular types of tanks: plastic and concrete. Selecting which one you wish to use may be a matter of the kind of land you live in as well as the cost you really can afford to spend. The benefits of using concrete over plastic tanks are that concrete is more sturdy and unlikely to float to the surface since a light plastic tank are capable of doing over time. Plastic evidently does not oxidize and is less heavy and generally simpler to put up. Concrete is difficult to damage but may easily crack as well, although it normally requires a lot more of a beating. If septic tank cost is a problem, plastic is much more reasonably priced as compared to concrete. However, not all states and local legislations permit plastic tanks at all. Ensure that you confirm the legality of a plastic tank in your area before deciding to purchase one.

Septic Tank Installation Manual:

Concrete septic tank installation begins the same way as the installation of any septic tank. Very first, pipes and waterways should be thought out and installed from the home to transport waste to the tank. These should drop enough for the waste to fall into the tank. This usually means roughly at 2% drop based on the length of the pipe from the residence to the tank. The amount of drop is vital as it will adjust the flow of waste to the tank and also avoid clogging. While 2% is serviceable, that is the minimum amount of drop possible. If you have enough depth to drop even further, that would be even better.

The following step will be to dig a hole big enough for your tank. Ensure that there is about 2 feet of space on every side of the tank in your hole. The hole needs to be measured from the bottom because the sides of the hole are almost never every right down and there should be enough room for workers to enter the hole with the tank later on and check out any cracks that may lead to leaks. Digging the hole should be done in a safe and sound manner with no less than one person spotting for the individual inside the hole. Take care when digging in loose or sandy soil. All machinery used in septic tank installation must be placed on solid ground that will not collapse and cause injury to individuals or damage to the equipment. Make sure to dig deep enough to house the bedding for the tank and also to have the tank low enough that it will join well with the pipe that has already been dropped from the house. Furthermore, clear the bottom of the tank of any big rocks and make sure it is perfectly level.

The service provider of the tank could come once your hole is dug and fit the tank into the hole for you. You must not find yourself liable for placing a tank that may weigh to 5 tons.